Project: Klang Valley MRT2 – System Work Package SSP-SY-203 Engineering Construction, Testing and Commissioning of Electrical Train and Depot Equipment, for Test Track Construction
A 600m long test track is constructed to test 49 sets of train cars for MRT Line 2 Usage. Upon completion of the train assembly, these trains will be tested according to project specifications and guidelines. This is the AC and DC electrical system where the electrical trains is using 750V DC for testing.